450 N Street Indoor Air Testing and Report Log
|
|
|
Get Free Acrobat Reader! Most documents on this page
are in the Adobe Portable Document Format (pdf). The current version of Acrobat
Reader should be used to view pdf files. A free copy of the Acrobat Reader
software is available from Adobe.
Anita Gore: Deputy Director, External Affairs Department
916-327-8988 |
| 24 |
24th Floor Mens Restroom Clearances |
HTI |
Completed |
Received/Posted |
June 26, 2008 - HTI Report |
| 24 |
Remediation |
DGS |
Pending |
Requested/Pending |
|
| 24 |
Clearance |
BioMax |
Pending |
Requested/Pending |
|
| 24 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 24 |
Post mitigation Assessment (Breakroom Area) |
BioMax |
Completed |
Received/Posted |
April 3, 2008 - BioMax Report |
| 24 |
Ceiling Tile Assessment |
HTI |
Completed |
Received/Posted |
February 19, 2008 - HTI Report |
| 24 |
Fungi Evaluation |
Sterling |
Completed |
Received/Posted |
October 29, 2007 - Sterling Report |
| 24 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 5, 2007 - MicroTest Report |
| 24 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report (3) |
| 24 |
Air and Tape sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report (2) |
| 24 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report |
| 24 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report |
| 24 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report(2) |
| 24 |
Air sampling |
LaCroix Davis |
Completed |
Received/Posted |
January 18, 2006 - LaCroix Davis Report |
| 24 |
Air sampling |
DGS |
Completed |
Received/Posted |
November 4, 2004 - DGS Report |
| 24 |
Air sampling |
DGS |
Completed |
Received/Posted |
July 20, 2004 - DGS Report |
| 22 |
Remediation |
BioMax |
Pending |
Requested/Pending |
|
| 22 |
Clearance |
BioMax |
Completed |
Received/Posted |
July 29, 2008 - Post Mitigation Assessment Report, 22nd Floor East |
| 22 |
Microbial Assessment |
BioMax |
Completed |
Received/Posted |
June 19th, 2008 - Microbial Assessment of 22nd Floor South Plenum Area |
| 22 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 22 |
Wall Cavity Testing |
HTI |
Completed |
Received/Posted |
February 15, 2008 - HTI Report |
| 22 |
January 4, 2008 Storm Water Intrusion |
McGinnis Chen |
Completed |
Received and Posted |
January 11, 2008 Report re Storm Water Intrusions |
| 22 |
Fungi Evaluation |
Sterling |
Completed |
Received/Posted |
October 29, 2007 - Sterling Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/ Posted |
October 5, 2007 - MicroTest Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report (2) |
| 22 |
Mold Evaluation |
Entek |
Completed |
Received/Posted |
June 15, 2007 - Entek Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
May 4, 2007 - MicroTest Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
May 2, 2007 - MicroTest Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
January 22, 2007 - MicroTest Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
December 6, 2006 - DGS |
| 22 |
Air sampling |
LaCroix Davis |
Completed |
Received/Posted |
January 18, 2006 - LaCroix Davis Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
December 1, 2005 - DGS Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
November 4, 2004 - DGS Report |
| 22 |
Air sampling |
DGS |
Completed |
Received/Posted |
July 20, 2004 - DGS Report |
| 21 |
Letter to HTI from David Gau |
David Gau |
Completed |
Received/Posted |
August 8, 2008 - Letter to HTI from David Gau |
| 21 |
Restroom Assessment Report |
HTI |
Completed |
Received/Posted |
June 30, 2008 - Restroom Assessment Report |
| 21 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 21 |
Indoor Air Quality Assessment |
HTI |
Completed |
Received/Posted |
April 4, 2008 - HTI Report (revised)* |
| 21 |
January 4, 2008 Storm Water Intrusion |
McGinnis Chen |
Completed |
Received and Posted |
January 11, 2008 Report re Storm Water Intrusions |
| 21 |
Fungi Evaluation |
Sterling |
Completed |
Received/Posted |
October 29, 2007- Sterling Report |
| 21 |
Air Sampling |
Entek |
Completed |
Received/Posted |
October 26, 2007 - Entek Report |
| 21 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 5, 2007 - MicroTest Report |
| 21 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report (3) |
| 21 |
Air Sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report (2) |
| 21 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report |
| 21 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report |
| 21 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report (2) |
| 21 |
Mold Evaluation |
Entek |
Completed |
Received/Posted |
June 15, 2007 - Entek Report |
| 19 |
Indoor Air Quality Assessment |
HTI |
Completed |
Received/Posted |
Aug 20, 2008 - Limited Indoor Air Quality Survey |
| 19 |
Restroom Assessment Report |
HTI |
Completed |
Received/Posted |
June 30, 2008 - Restroom Assessment Report |
| 19 |
Mitigation Procedures Report |
BioMax |
Completed |
Received/Posted |
June 18, 2008 - BioMax Mitigation Procedures Report, Rooms 1905 and 1908 |
| 19 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 19 |
January 4, 2008 Storm Water Intrusion |
McGinnis Chen |
Completed |
Received and Posted |
January 11, 2008 Report re Storm Water Intrusions |
| 19 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report |
| 19 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report (2) |
| 19 |
Air Sampling |
DGS |
Completed |
Received/Posted |
October 2, 2007 - MicroTest Report |
| 11 |
Restroom Assessment Report |
HTI |
Completed |
Received/Posted |
June 30, 2008 - Restroom Assessment Report |
| 11 |
Indoor Air Quality Assessment, 11th Floor |
HTI |
Completed |
Received/Posted |
June 19, 2008 -- Limited Indoor Air Quality Survey, 11th Floor (revised)* |
| 11 |
Indoor Air Quality Assessment |
HTI |
Completed |
Requested/Pending |
|
| 11 |
12th Floor Pipe Leak |
HTI |
|
|
|
| 11 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 11 |
January 4, 2008 Storm Water Intrusion |
McGinnis Chen |
Completed |
Received and Posted |
January 11, 2008 Report re Storm Water Intrusions |
| 11 |
Fungi Evaluation |
Sterling |
Completed |
Received/Posted |
October 29, 2007- Sterling Report |
| 11 |
Air Sampling |
Entek |
Completed |
Received/Posted |
October 26, 2007 - Entek Report |
| 11 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 5, 2007 - MicroTest Report |
| 11 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report (3) |
| 11 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report |
| 11 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report |
| 11 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report (2) |
| 11 |
Air Sampling |
DGS |
Completed |
Received/Posted |
October 2, 2007 - MicroTest Report |
| 11 |
Air sampling |
LaCroix Davis |
Completed |
Received/Posted |
January 18, 2006 - LaCroix Davis Report |
| 11 |
Air sampling |
DGS |
Completed |
Received/Posted |
November 4, 2004 - DGS Report |
| 11 |
Air sampling |
DGS |
Completed |
Received/Posted |
July 20, 2004 - DGS Report |
| 10 |
Restroom Assessment Report |
HTI |
Completed |
Received/Posted |
June 30, 2008 - Restroom Assessment Report |
| 10 |
Indoor Air Quality Assessment |
HTI |
Completed |
Received/Posted |
July 31, 2008 Limited Indoor Air Quality Survey |
| 10 |
Remediation |
DGS |
|
|
|
| 10 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 10 |
Post Mitigation Assessment |
BioMax |
Completed |
Received/Posted |
March 19, 2008-BioMax Report |
| 10 |
Breakroom Clearance |
HTI |
Completed |
Received/Posted |
February 29, 2008 HTI Report |
| 10 |
Breakroom follow Up Air Sampling |
HTI |
Completed |
Received/Posted |
February 29, 2008 HTI Report |
| 10 |
Breakroom Health Impact |
Munday |
Completed |
Received/Posted |
February 6, 2008 Munday Report |
| 10 |
Break Room Air Sampling |
HTI |
Completed |
Received/Posted |
February 1, 2008 HTI Report |
| 10 |
January 4, 2008 Storm Water Intrusion |
McGinnis Chen |
Completed |
Received and Posted |
January 11, 2008 Report re Storm Water Intrusions |
| 10 |
Air Sampling |
DGS |
Completed |
Received/Posted |
October 2, 2007 - MicroTest Report |
| 7 |
Employee Inquiry, Cubicle 140 |
HTI |
Completed |
Posted |
October 8, 2008 - Limited Fungal Growth Assessment Report |
| 7 |
Restroom Assessment Report |
HTI |
Completed |
Received/Posted |
June 30, 2008 - Restroom Assessment Report |
| 7 |
Report On The 7th Floor |
BioMax Environmental, LLC |
Completed |
Received and Posted |
BioMax Email Report Regarding Break Room 704 |
| 7 |
Indoor Air Quality Assessment |
HTI |
Completed |
Received/Posted |
July 18, 2008-7th Floor Indoor Air Quality Report (revised)* |
| 7 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 7 |
January 4, 2008 Storm Water Intrusion |
McGinnis Chen |
Completed |
Received and Posted |
January 11, 2008 Report re Storm Water Intrusions |
| 7 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report (3) |
| 7 |
Air sampling |
DGS |
Completed |
Posted |
October 4, 2007 - MicroTest Report |
| 7 |
Air Sampling |
DGS |
Completed |
Received/Posted |
October 2, 2007 - MicroTest Report |
| 7 |
Air sampling |
LaCroix Davis |
Completed |
Received/Posted |
January 18, 2006 - LaCroix Davis Report |
| 3 |
Restroom Assessment Report |
HTI |
Completed |
Received/Posted |
June 30, 2008 - Restroom Assessment Report |
| 3 |
Indoor Air Quality Survey |
HTI |
Completed |
Received/Posted |
June 25, 2008 - Air Quality Report (revised)* |
| 3 |
Indoor Air Quality Assessment |
HTI |
Completed |
Requested/Pending |
|
| 3 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 3 |
Fungi Evaluation |
Sterling |
Completed |
Received/Posted |
October 29, 2007- Sterling Report |
| 3 |
Air Sampling |
Entek |
Completed |
Received/Posted |
October 26, 2007 - Entek Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 5, 2007 - MicroTest Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report (3) |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 4, 2007 - MicroTest Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
October 3, 2007 - MicroTest Report (2) |
| 3 |
Air Sampling |
DGS |
Completed |
Received/Posted |
October 2, 2007 - MicroTest Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
January 22, 2007 - MicroTest Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
January 10, 2007 - MicroTest Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
February 27, 2006 - MicroTest Report |
| 3 |
Air sampling |
LaCroix Davis |
Completed |
Received/Posted |
January 18, 2006 - LaCroix Davis Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
November 4, 2004 - DGS Report |
| 3 |
Air sampling |
DGS |
Completed |
Received/Posted |
July 20, 2004 - DGS Report |
| 1 |
Indoor Air Quality Survey |
HTI |
Completed |
Received/Posted |
September 4, 2008 - Limited Indoor Air Quality Survey - 1st Floor |
| 1 |
Microbial Assessment and Mitigation Procedures |
BioMax |
Completed |
Received/Posted |
August 19, 2008 - Microbial Assessment and Mitigation Procedures - First Floor Security Kiosk Area |
| 1 |
Room 135 Assessment Report |
HTI |
Completed |
Received/Posted |
August 1, 2008 - Print Room 135 Report |
| 1 |
Restroom Assessment Report |
HTI |
Completed |
Received/Posted |
June 30, 2008 - Restroom Assessment Report |
| 1 |
Limited Fungal Growth Exposure Assessment Survey |
HTI |
Completed |
Received/Posted |
June 16, 2008 first Floor Security Guard Kiosk |
| 1 |
Indoor Air Quality Assessment |
HTI |
In progress |
Requested/Pending |
|
| 1 |
Sprinkler Leak |
HTI |
|
|
|
| 1 |
Cal/OHSA Notice of No Violation 5/23/08 |
Cal/OHSA |
Completed |
Received/Posted |
May 23, 2008 - Cal/OHSA Notice |
| 1 |
Day Care |
HTI |
Completed |
Requested/Pending |
May 1, 2008 -HTI Report |
| 1 |
1st Floor Assessment Report |
HTI |
Completed |
Received/Posted |
April 16, 2008 - HTI Report |
| 1 |
Day Care |
HTI |
Completed |
Received/Posted |
January 7, 2008 HTI Report |
| 1 |
Mail Room |
HTI |
Completed |
Received and Posted |
December 4, 2007 HTI Report |
| 1 |
Day Care |
HTI |
Completed |
Received/Posted |
November 28, 2007 HTI Report |
| 1 |
Fungi Evaluation |
Sterling |
Completed |
Received/Posted |
October 29, 2007- Sterling Report |
| 1 |
Air Sampling |
DGS |
Completed |
Received and Posted |
October 2, 2007 - Microtest |
| 1 |
Air sampling |
DGS |
Completed |
Posted |
January 22, 2007 - MicroTest Report |
| 1 |
Clearance |
BioMax |
Completed |
Received/Posted |
July 26, 2008 Post Mitigation Assessment, 1st Floor Conference Room Areas |
| |
| Elevator Shaft 1 |
HTI |
Completed |
Received/Posted |
August 12, 2008 - Elevator Shaft 1 Photos |
| Elevator Shaft 2 |
HTI |
Completed |
Received/Posted |
August 12, 2008 - Elevator Shaft 2 Photos |
| Elevator Shaft 3 |
HTI |
Completed |
Received/Posted |
August 12, 2008 - Elevator Shaft 3 Photos |
| Elevator Shaft 4 |
HTI |
Completed |
Received/Posted |
August 12, 2008 - Elevator Shaft 4 Photos |
| Elevator Shaft 5 |
HTI |
Completed |
Received/Posted |
August 17, 2008 - Elevator Shaft 5 Photos |
| Elevator Shaft 6 |
HTI |
Completed |
Received/Posted |
August 17, 2008 - Elevator Shaft 6 Photos |
| Elevator Shaft 7 |
HTI |
Completed |
Received/Posted |
August 20, 2008 - Elevator Shaft 7 Photos |
| Elevator Shaft 8 |
HTI |
Completed |
Received/Posted |
August 18, 2008 - Elevator Shaft 8 Photos |
| Elevator Shaft 9 |
HTI |
Completed |
Received/Posted |
August 18, 2008 - Elevator Shaft 9 Photos |
| Elevator Shaft 10 |
HTI |
Completed |
Received/Posted |
August 11, 2008 - Elevator Shaft 10 Photos |
| Freight Elevator Shaft |
HTI |
Completed |
Received/Posted |
August 11, 2008 - Freight Elevator Shaft Photos |
|
| Elevators |
Air Sampling Report |
Hygiene Tech |
Completed |
Received/Posted |
December 17, 2008-Limited Fungal Growth Exposure Assessment Survey Elevator Lobby Areas |
| Elevators |
Air Sampling Report |
Hygiene Tech |
Completed |
Received/Posted |
December 15, 2008-Limited Fungal Growth Exposure Assessment Follow-Up Survey Elevator Lobby Areas |
| Elevators |
Air Sampling Report |
Hygiene Tech |
Completed |
Received/Posted |
September 24, 2008 - Limited Fungal Growth Exposure Assessment Survey - Elevator Lobby Areas |
| Elevators |
Preliminary External Elevator Shaft Observations |
LaCroix Davis |
Completed |
Received/Posted |
September 4, 2008 Preliminary External Elevator Shaft Observations, 22nd Floor |
| Elevators |
Preliminary Interior Elevator Shaft Report |
LaCroix Davis |
Completed |
Received/Posted |
September 2, 2008 Preliminary Interior Elevator Shaft Report |
| Elevators |
Response to August 6 David Gau Letter |
DGS |
Completed |
Received/Posted |
August 11, 2008 DGS Letter Response to Gau Inquiry |
| Elevators |
Highlight Investigative Work |
David Gau |
Completed |
Received/Posted |
August 8, 2008 Additional Water Intrusion Investigative Work |
| Elevators |
Request for Work Plan |
David Gau |
Completed |
Received/Posted |
August 8, 2008 Letter to HTI from David Gau Elevator Shaft and 21st Floor Odors |
| Elevators |
Request for Clarification |
David Gau |
Completed |
Received/Posted |
August 6, 2008 Follow up Letter to DGS from David Gau |
| Elevators |
Preliminary Elevator Survey |
LaCroix Davis |
Completed |
Received/Posted |
August 4, 2008 Preliminary Elevator Survey and Planned Scope of Work |
| Elevators |
Discovery of Evidence of Water Intrusion |
HTI |
Completed |
Received/Posted |
August 1, 2008 Discovery of Evidence of Water Intrusion Elevator shafts |
| Elevators |
Request for preliminary report |
David Gau |
Completed |
Received/Posted |
August 1, 2008 Letter to DGS from David Gau Elevator Shafts |
| Elevators |
Air Quality Report |
HTI |
Completed |
Received/Posted |
July 28, 2008 Limited Fungal Growth Exposure Assessment Survey Report |
| Elevators |
Visual Inspection Memo |
HTI |
Completed |
Received/Posted |
July 25, 2008 Elevator Shafts Visual Inspection Memo |
| Elevators |
Elevator Survey |
LaCroix Davis |
Completed |
Received/Posted |
July 24, 2008 Preliminary Elevator Survey |
| *Per Hygiene Technologies, the revision to this document is a one word change made in the first sentence of the second paragraph in Section 4.5 replacing the word "respirable" with "total" in reference to dust. Respirable dust refers to the portion of airborne dust that's small enough to penetrate the nose and upper respiratory into the lungs. Total dust includes all airborne particles, regardless of size or composition. The sampling method Hygiene Technologies employed in the BOE building collects total dust only.
|